EV Charger Installation in Gladesville

EV charger installation in Gladesville, done on a dedicated circuit by licensed sparkies who check what your board can carry before quoting. Call (02) 9134 9026 for a free written quote.

Booked in FastCharger jobs land in the diary often same or next day when the gear is here.
Work That Holds UpLifetime workmanship guarantee on the install, 12-month product warranty on the unit.
First Job, Fifty OffNew to us? $50 off your first service applies to the charger install too.
Rated by Sydney Homes600+ five-star reviews, and a licensed electrician on every one of them.

When It Is Time for EV Charger Installation

Most charger jobs start with a car on order. The other kind starts with a portable lead that has been doing the work for months, and that one is more urgent than it looks.

  • The car has a build date and you want charging ready before it turns up.
  • A portable lead off a power point is taking overnight and still not filling the battery.
  • The socket the lead plugs into is warm, discoloured or on the same circuit as the fridge.
  • You are running an extension lead across a path, which is a trip hazard and a weather problem.
  • A second car is arriving and one charge point will not stretch across both.
  • Solar is on the roof and you want the car drinking daytime power rather than grid power at night.
Electrician testing circuits in a switchboard with a multimeter

What We Handle Under EV Charger Installation

We do the electrical side properly and leave the car to you. That means the whole chain: the board, the circuit, the run and the unit on your wall.

  • Load check first. We work out what your supply and board can actually carry before anyone talks about brackets and mounting heights.
  • A dedicated circuit. Its own protected circuit back to the board, sized for continuous load rather than for a kettle.
  • Charger mounting and cable run. Wall or post, garage or carport, with the run planned so the cable is not draped over anything.
  • Board work where needed. A spare way, an RCBO, or a full switchboard upgrade if the board has nothing left to give.
  • Supply upgrades. If the mains cannot carry it, that is Level 2 work on the service side, and we handle that too.
  • Testing and handover. The charger is proved under load, and we show you what the lights on it mean before we go.
Call (02) 9134 9026
Electrician working on the wiring inside a switchboard

EV Charger Installation Pricing: What Moves the Quote

Chargers are one of the few jobs where the wall unit is often the smaller half of the price. These are the things that actually move it.

  • Distance from board to bay. Every metre of cable and every wall it crosses costs something, and a board at the front of a house with parking at the back is the expensive version.
  • What the board can take. In the older brick houses here the board is frequently undersized once a charger joins the family, so the upgrade gets priced in the same quote rather than sprung on you later.
  • Your supply. Single-phase, three-phase, and whether the mains have the headroom for a continuous load.
  • The charger you pick. Basic units, smart units and load-managed units are all valid, and they are not the same money.
  • Where the run goes. Surface conduit in a garage is quick, while a cable through a solid wall or under a driveway is not.

Quotes are free, they come in writing after we have seen the board and the bay, and the price we quote is the price you pay.

Electrician installing a wall power point

EV Charger Installation in Gladesville Homes

The car is the same everywhere. The house it plugs into is not.

Gladesville is a mixed patch: detached brick houses and heritage cottages with off-street parking, and unit and apartment blocks where the parking is a bay in a shared basement.

In a house, the job is usually about the board. Older brick homes here often need the switchboard upgraded once modern appliances arrive, and a charger is the biggest appliance most people will ever add.

In a unit, the electrical work is straightforward and everything else is not. The cable crosses common property, so your committee, your building's supply and your bay all have to agree before a bracket goes on a wall.

Michael, in our Google reviews, mentioned being talked through the options rather than sold one. That is exactly what this job needs, because the cheapest charger and the right charger are rarely the same box.

Call (02) 9134 9026
Electrician testing circuits in a switchboard with a multimeter

What NSW Requires for EV Charger Installation

A charger is fixed wiring, so it is built to the AS/NZS 3000 wiring rules like everything else in the house.

The rules matter more here than on most jobs, because a charger pulls near its maximum for hours at a time. That is why it gets a dedicated circuit with its own RCD protection, sized for the real load rather than the rated load of a power point.

This is notifiable electrical work. A Certificate of Compliance for Electrical Work is lodged with NSW Fair Trading and copied to you.

Larger installs may need the load cleared with the network before they go ahead, and any change on the supply side is Level 2 territory. We tell you which of those apply at quoting time, not afterwards.

Electrician working on the wiring inside a switchboard

The Process, and What It Typically Takes

Most home installs are a half-day once the gear is on site. Add a board upgrade or a longer run and it becomes a full day.

  1. We assess. Board, supply, parking spot, cable route, and the charger you are considering, then a written price.
  2. We confirm the gear. If your charger suits the house we fit it; if it does not, we say so before you buy it.
  3. We install. Circuit run, charger mounted, board work done, drop sheets down and the place left tidy.
  4. We test and show you. Tested before we sign off, proved under a real charge, paperwork lodged and emailed.
Call (02) 9134 9026
Electrician installing a wall power point

The Difference on an EV Charger Installation Job

Plenty of sparkies will hang a charger on a wall. The difference is in what happens before that.

We check the board and the supply first, because a charger fitted to a board with no headroom becomes a nuisance-tripping problem three months later, and by then everyone has forgotten why.

Bookings often same or next day, a licensed electrician on the tools, and the price agreed before any work starts.

Electrician testing circuits in a switchboard with a multimeter

Servicing Gladesville and the Suburbs Around It

Charger jobs pair naturally with the board work or the Level 2 service upgrade that makes room for them, and we quote the lot together.

We cover Gladesville and the surrounding Ryde area, including Meadowbank, West Ryde and Mortlake.

Electrician working on the wiring inside a switchboard

Call Now and Get It Sorted

Tell us the car and roughly where it parks. Call (02) 9134 9026 and we will work out what your house can carry, then put a written price on it.

Common questions

Your EV Charger Installation FAQs

Six questions new EV owners put to us.

Does EV charger installation have to be done by a licensed sparkie?

Yes. A charger is hardwired, sits on its own circuit and draws more current for longer than anything else in the house, so it is licensed work start to finish. A portable lead into a power point is legal but slow, and that is exactly the load that finds a tired socket.

How much of the day should I set aside for an EV charger installation?

Half a day covers the common version, where the board sits close to the parking spot and has a spare way. Long cable routes, a board on the wrong side of the house or a supply upgrade push it out to a full day or two visits, and you will know which before we start.

What guarantee do you give on an EV charger installation?

Our workmanship is guaranteed for life, so a fault in the install itself is on us. The charger carries a 12-month product warranty from us on top of the maker's cover, and the compliance paperwork lands with you when we finish.

What usually tells people they need an EV charger installed?

Usually a new car with a build date on it. The rest of the time it is a portable lead that takes all night and a power point behind the car that has started to feel warm, which is the real signal to stop and get a proper circuit in.

Do you handle strata or apartment EV charger installation in Gladesville?

We do, though the electrical side is often the easy half. Cabling from a basement board to a bay crosses common property, so the committee and the building's supply both get a say, and we can quote what we would need to run before you go to them.

How long does the power stay off during an EV charger installation?

Not long. The house stays live for most of the visit, and the only genuine outage is the stretch while the new circuit is landed in the board, which is usually well under an hour.